Cart

{{ successMessage }}
{{item.orderingCode}}
Qty: {{ item.quantity }}
{{currencySymbol}}{{item.pricing.totalPrice | intlNumber('en-BS','USD')}}
Subtotal ({{totalQty}} {{totalQty === 1 ? "item" : "items"}}):
{{currencySymbol}}{{cartSummary.total | intlNumber('en-BS','USD')}}
TEST SITE
You will not be charged yet.

Lowara plays its part in Bahrain’s global ambitions

Lowara plays its part in Bahrain’s global ambitions

Summary
Summary

Prime Minister of Bahrain

Bahrain


Bahrain has set its ambitions high with the development of the $1.5billion Financial Harbour project, with an aim to become a global economic centre of excellence.

Application: Municipal water supply

Lowara has risen to the challenge and played its part in the successful first stage of the project, which was formally inaugurated on May 2007 by the Prime Minister. Lowara was tested to its limits by the scope of the project, the expectations of the consultants and contractor, and in fighting off competition from two other manufacturers.

The commissions included:

  • transfer and booster pumpsets installed in the huge 53-storey dual towers
  • transfer and variable speed booster pumpsets both in the 6 storey Harbour Mall and 6 storey Financial Mall
  • submersible lift pit and tank drain pumpsets.