Pump Station Retrofit & Upgrade

Design | Install | Commission | Maintain

From concept to completion, our experts can help you at every stage of your project. Offering bespoke solutions to suit all applications and budgets, you can rest assured that we will future proof your project by designing to meet your local water company specifications.

Install

Installation expertise

On receipt of your declaration of site-readiness document, we will conduct a site visit if required, for a visual inspection prior to installation. This avoids any unnecessary delays. Our experienced and fully certified engineers will then carry out staged electrical and mechanical installation to suit your programme of works.

Our standard operating procedures will give you peace of mind in the knowledge that all relevant ESH regulations are adhered to. A typical guideline for a 12 week installation programme:

Week 1       procurement of pumps and ancillary equipment

Week 5       first fix of ancillary equipment

Week 10     second fix of pumps and panel

Week 12     third attendance for final commissioning and hand over

Design

Meeting the design criteria

We liaise closely with the appropriate water authority at an early stage in every project to ensure that your pumping station will meet the authority’s full design criteria and SFA requirements, paving the way for future adoption. At the same time, our expert designers will make sure that we can procure and build the most cost-effective pumping station possible.

Xylem provides a pre-adoption advisory service for UK property developers: We offer this service to avoid the difficulties facing many developers who still have other suppliers’ pumping stations among their assets, because they were unable to transfer ownership to the local water authority. Our experienced consultants work closely with developer and local Water Company to guarantee successful adoption and transfer of the asset.

Commission

Commissioning expertise

Xylem’s commissioning engineers are all approved by the NICEIC and offer a commissioning service for our pumping stations and related control equipment. Our commissioning service not only ensures the correct electrical connection of pumps, floats and ancillaries, but we will ensure that your pumping station is fully functional and optimised to your particular application upon completion.

Maintain

Xylem in the UK provides a fully comprehensive aftercare service, including 24/7 emergency breakdown attendance, preventative maintenance contracts, workshop repair and pumping station refurbishments. It is our aim to provide customers with the highest possible level of care, from pre-sale and throughout the entire lifetime of the product. Our nationwide network of strategically located service centres is supported by a mobile team, reacting quickly to call-outs.